Chan, A T S and Chan, E H W (2005) Impact of Perceived Leadership Styles on Work Outcomes: Case of Building Professionals. Journal of Construction Engineering and Management, 131(04), 413–22.

Cheng, E W L and Li, H (2005) Analytic Network Process Applied to Project Selection. Journal of Construction Engineering and Management, 131(04), 459–66.

Ekström, M A and Björnsson, H C (2005) Valuing Flexibility in Architecture, Engineering, and Construction Information Technology Investments. Journal of Construction Engineering and Management, 131(04), 431–8.

El-Rayes, K and Hyari, K (2005) {[}CONLIGHT:{]} Lighting Design Model for Nighttime Highway Construction. Journal of Construction Engineering and Management, 131(04), 467–76.

El-Rayes, K and Kandil, A (2005) Time-Cost-Quality Trade-Off Analysis for Highway Construction. Journal of Construction Engineering and Management, 131(04), 477–86.

  • Type: Journal Article
  • Keywords: Information technology (IT); Algorithms; Highway construction; Cost control; Contracts; Construction industry;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2005)131:4(477)
  • Abstract:
    Many departments of transportation have recently started to utilize innovative contracting methods that provide new incentives for improving construction quality. These emerging contracts place an increasing pressure on decision makers in the construction industry to search for an optimal resource utilization plan that minimizes construction cost and time while maximizing its quality. This paper presents a multiobjective optimization model that supports decision makers in performing this challenging task. The model is designed to transform the traditional two-dimensional time-cost tradeoff analysis to an advanced three-dimensional time-cost-quality trade-off analysis. The model is developed as a multiobjective genetic algorithm to provide the capability of quantifying and considering quality in construction optimization. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating and visualizing optimal tradeoffs among construction time, cost, and quality.

Elazouni, A M and Metwally, F G (2005) Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms. Journal of Construction Engineering and Management, 131(04), 400–12.

Gil, N, Tommelein, I D, Stout, A and Garrett, T (2005) Embodying Product and Process Flexibility to Cope with Challenging Project Deliveries. Journal of Construction Engineering and Management, 131(04), 439–48.

Hinze, J (2005) Use of Trench Boxes for Worker Protection. Journal of Construction Engineering and Management, 131(04), 494–500.

Lee, E and Ibbs, C W (2005) Computer Simulation Model: Construction Analysis for Pavement Rehabilitation Strategies. Journal of Construction Engineering and Management, 131(04), 449–58.

Liu, M and Ling, Y Y (2005) Modeling a Contractor’s Markup Estimation. Journal of Construction Engineering and Management, 131(04), 391–9.

Navon, R and Shpatnitsky, Y (2005) Field Experiments in Automated Monitoring of Road Construction. Journal of Construction Engineering and Management, 131(04), 487–93.

Zhang, J, Eastham, D L and Bernold, L E (2005) Waste-Based Management in Residential Construction. Journal of Construction Engineering and Management, 131(04), 423–30.